IGNITION: The Continuous Miner was cutting coal and rock in the No. 1 Entry on No. 8 Section when a frictional ignition occurred. When the operator sheared down with Miner Head to the mine floor, the ignition occurred. The ignition lasted approximately 2 minutes and was put out with a fire extinguisher and wash down hose.