On 5/8/10 the 17 W. section #3 entry experienced an inundation of Methane in excess of 5.%. After intersecting horizontal WCC (BH-3A-ST-2) the power was removed immediately from this area as per cut thru plan. Entry was re-ventilated to correct condition. Section was placed on a J order, then K order to allow mining to resume.