The 4160 cable at the 3c-10 substation blew out and burnt the cable. As a pre-caution, the crew 11 men were evacuated. The team leader insured the crew was out and used a 20lb. fire extingusher to put out the fire. Electricians were called in to perform repairs. Incident occured at 1:15 a.m the evacuation was complete at 1:45 a.m. Mine was checked and cleared for reentry.