A thunderstorm interrupted power to hoist. At 2:20 a.m. the power was restored, but there were problems resetting the hoist. At 2:40 a.m. MSHA was notified of the problem via the hot line. At 2:42 a.m. the electricians found that a fuse had blown and replaced it, bringing the hoist back into operation.