The hoist went down at 8:35 AM 23 men were under ground, the hotline was called at 8:53am. The men assembled at the escape shaft, the escape hoist was activated and escape hoist lowered to retrieve men. The hoist was repaired by 9:34 am and the crew returned to their work stations.