The initial cave behind the shields after a longwall move has been completed, is expected after mining the first 100-feet. The initial cave for the 17-left Longwall occurred on December 3, 2010 at 5:53am. MSHA was contacted immediately, which resulted in MSHA placing a 103-J order on the mine until ventilation was restored in 17-Left longwall.