At approximately 12:30 am several large pieces of the high wall dislodged due to the recent freezing and thawing. The rock struck the top of the belt entry canopy,crushing it and damaging the belt structure under it. A plan to remove the damaged canopy and belt structure was put in place and approved by MSHA and the OMSL. There were no injuries in conjunction with this incident.