EE was pumping cribs #3 entry at break 36 when the hoses lost pressure. It was discovered the cement line blew apart in #4 entry at break 35. The surface was contacted and instructed to reduce the flow rate. EE tried to reconnect the lines with material still flowing but could not. The line blew in a waterhole which filled with material soaking his boots.