Mine Foreman was making his exam and checking pumps(We were having heavy rainfall this early AM and the day before)When he encountered 11-12"" of water in the #7 entry/Intake Spad 768. All men were pulled back past the affected areas. Additional pumps were set to drain water to surface. Agency notified.