While attempting to connect 3 north mains to 2 east panel 4 for the purposes of pumping water from worked out panel an inundation occurred. The amount of water encountered at cut through was greater than expected & the result of the inflow typically was from a feathers edge to 6""-12"" deep with the max. being approx 30"" in a swag in belt entry. No injuries or entrapment occurred.