DC loop contactor contacts arcing, burnt out bolt holding operating side of contact assembly. System ground faulted stopping the hoist. EE contacted the MSHA hotline. The mine was evacuated. A spare loop contactor was installed and the hoist resumed normal operations at 2:24 pm.