At 8:50 p.m. on 8/6/2011 the site lost power. The power interruption reset the PLC controlling the ID fan and ball mill tempering damper causing a partial system shutdown. At 9:29 p.m. the fuel system was restarted and the coal in the #1 Ball Mill system self ignited. No personal or property damage resulted from the ignition.