Employee was at #8 belt heads line splitter waiting for power to be set up outby his location. When power was supplied to the kva it created an arc. He was standing about 5' from flash. His eyes were flushed and he was given eye drops. He returned to work on his next shift. The arc was created by a loose phase lead.