A roof fall occurred in the intersection of the 1st East Submain at spad number 21+90 measuring approximately 20ft. long x 19ft. wide x 8ft. high. This area was supported with 4ft. fully grouted roof bolts and 8ft. cable bolts. This area was mined in April 2011.