Spoil side highwall sloughed off due to unstable material (sand and water). The area was accessible at the time of slide. MSHA was called and a 103(j) order was issued. Upon arrival, MSHA inspector modified the initial order and a 103(k) order was issued. Dozers were allowed to slope and stabilize the area and the 103(k) order was terminated.