The preshift mine examiner discovered a roof fall above the anchorage zone in the North Mains, Entry #2, Crosscut 18. The fall measured 14' wide x 16' long x 6-7' high. The area was mined in August, 2008. The area was supported with 6' fully grouted resin roof bolts.