At approx 1:15am the production hoist #30 lost power. Electrician were called and found and replaced a wire that powers hoist controls. At approx 8:30 am the hoist was put back in service. MSHA was called at 1:15am and hoist was reported down. At 9:20 am MSHA was contacted that the hoist was back in service.