A conveyor transfer had plugged and spilled material around the tail section. The area was being cleaned up by the production crew utilizing manual labor and a mini skid-steer. A 3-ft section slip-lock PVC piping was attempted to be pulled from an elbow to provide add'l working room. Unfortunately, the pipe slip-joint connection was stronger than perceived by the miner.