Upon inspection of new porthole, Mine manager found approx: 2 ton of material had slabbed off the face and into new established porthole pulling down a bolt. Mine Manager called immediately reportable hot line at 6:11 am and was on hold for 11 min and 55sec. At this point he hung up and recalled and got through to some one and reported his finding.