There was a malfunction in a regulator at the Avista Electric Company substation which supplies power to our facility. This malfunction resulted in a high voltage situation which tripped our high voltage relays causing power to kick out. There was no one in the conveyance when the power tripped. As a precautionary measure we evacuated all underground personnel.