There has been a roof fall outby the 001-0 and 002-0 working section. This fall is located in the No.3 entry at spad No.68, this fall measures 17'x80'x4'. The fall does not impede travel or effect the course of air. This fall will be temporarily dangered off and cleaned up at a later date.