Towards the end of 1st shift the production hoist tripped out due to an auxiliary contactor in the hoist house control panel. This shut the hoist down creating an evacuation due to not having two escapeways to surface. The mine was evacuated with not injuries or other problems. The issue was corrected an the hoist was put back into service at 2:15PM on 6/21/2012.