The operator is filing this 7000-1 under protest and to comply with the mandatory abatement provisions of the act. Constructing a pond, personnel filled the pond to ensure impermeability. The next morning the water level had lowered. MSHA was notified immediately. No soil disturbance or material failure was discovered.