At 1:57 pm power was lost due to a blown lightning resistor in the surface substation. 2:05pm the decision was made to evacuate the mine, 2:08 pm MSHA was notified. #3 hoist was used on generator power to hoist employees out of the mine. All employees out by 3:35 pm. 4:14 pm power was restored to the mine.