EE was directed by the dump operator to dump part of the load on top to repair a low berm. The operator pulled forward to allow the material to flow out, as the bed cleared the berm, the bed raised, then dropped to the level it had been hoisted, jarring the ee. EE was given restrictions until cleared by PCP. Restrictions could not be accommodated. Ongoing.