The crew at the mine were performing some crusher repair maintenance, and were required to conduct some cutting and welding. There must have been some smoldering slag that was not noticed by the crew and the belt on 1C conveyor caught fire. The fire was put out by the local fire department and the damage was approximately $7000.00 and one lost week of production.