The scaffold upright (vertical)supports have receiver cups that are welded by the manufacturer onto the upright poles at predetermined intervals. Thus it was slightly higher than the preferred level. Due to the construction, it would have been either be too low, causing employees to extend their reach too far, or too high, causing employees to be working very slightly bowed.