A power surge on the feed line tripped circuit breakers to the hoist. The main external circuit breaker was reset but not the internal circuit breaker. A qualified person was sent from the mine site to reset the internal circuit breaker but due to travel time, the hoist was down for more than 30 minutes. When the internal breaker was reset at 10:10, the hoist was fully functional.