Off shift blasting was conducted by the blasting crew. Heading 459BL1 was blasted and the blasting crew left the mine without incident. On coming post blast inspection was conducted by the oncoming post blast inspection team and it was recognized that a sulfide dust ignition had occurred during the blast. All gas readings checked during the post blast inspection were negative.