On 8/6/13 while operating a shaft sinking operator at the mine the hoist experienced a fault on over and under wind of the hoist control panel. The fault would not let the hoistman operate the hoist The electrical dept. trouble shot the fault reset and tested the hoist. The miners in the shaft exited the mine via secondary escape using the 890 RT crane and man basket.