The northeast was engulfed in a winter blizzard. All personnel were leaving the mine early. There was a power outage causing the service hoist to kick out and the high speed breaker on the hoist not to function. It took one and one half hours to get the high speed breaker to function again causing the hoist to be down that long. The service shaft is one of the two escapeways.