On March 19, 2014, the power to site failed, tripping out three hoists. Power was restored at 11:51am, and the hoists were reset and functioning by 12:42pm. The power loss occurred during calibration trip units on the main switch gear. It was determined that one of the trip units was incorrectly connected.