On or about 7/14/2014 an unplanned roof fall occurred at cross cut # 59 on the 2nd Southwest Sub-mains at the approach to the #1 seal. The area was bolted with 8' and 10' roof bolts. The fall will be cleaned up. The fall was fractured laminated stack rock. The fall was approximately 18'Wide x 18' Long X 8' High.