Approx. 10:30A.M. on the #2 section in the intersection of #2 entry a roof fall occurred. The fall was approx. 20'W X 20'L X 5'-6'H the area was supported with 5' fully grouted resin bolts and supplemental 10' cables bolts. The area will be cleaned up to recover a Fletcher bolter that was covered up in the fall. The area has been dangered off and cribs set at all approaches.