CAH was in calcination area shutting down #2 injection pump from caustic cleaning. When shut down, he opened the drain, and the drain on the suction sprayed the left lower leg. Rinsed underneath #1 hytank for 5 minutes before going to dispensary for 20 minute shower. Evaluated by RN and seen by Dr. for pain medication. Returned to work on 09/30/14.