Sometime between end of day shift on October 7 and start of day shift on October 08, 2014, the back in 5190 3000 South failed and the failure migrated into part of the 5190 East Lateral back. The back failure also pushed broken muck into the 5190 East Lateral (Figure #1) covering the SMD Sky Track which was being used to install long swellex bolts.