The Jewell shaft double drum hoist engineer was dumping the north skip. After the skip was emptied, the skip was lowered before opening the wind gate at the shaft collar. The skip sat on the gate causing the rope to slack. When the slack was gathered, the hoist rope kinked. No personnel were down shaft at time of occurrence. Hoist rope will be repaired (cut).