1597 Scaling rig ruptured a hydraulic hose which caused a fire. The suppression system shut off the rig and went off as designed. The employee was able to get safely off of the rig and noticed a fire that was burning uncontrollably. Everyone was evacuated safely and the scaler burnt to the ground. The scaling rig was a total loss and the mine was shut down for two days.