AMS operator discovered that Deer Creek hoist had lost operational power. Due to surface travel distance to the site, the hoist was inoperable for more than 30 minutes. When personnel arrived at the site, they found a circuit breaker had tripped. The circuit breaker was reset, restoring power to the hoist.