An unintentional fall of the roof occurred on the A North panel. the fall occurred in the #3 entry Crosscut #4 neutral entry spad #145. It was 50 ft long, 18 ft wide and 6 ft high. This area has been cribbed off and dangered off. It will not be cleaned up.