While the lower skip work deck with 3 personnel on the conveyance was exiting the dump pocket the dump arm on the skip became jammed. An ""all-stop"" was given, the condition evaluated and it was determined that the dump arm would need to be cut to free the skip. The task was completed in approximately 1.5 hours.