Employee was working on the 3rd floor pre-heat tower. At approximately 3 a.m., he started using the WOMA high pressure water gun to remove buildup within the riser. After using this tool for approximately two minutes, he felt a strain in his R wrist. He immediately stopped working with the water gun. (Note: He was working a C shift.)