While testing 9 South #4 escape capsule the chain which controls the level wind broke which also bent the mounting bolts of the sprocket. Ketchem Construction came and replaced chain and mounting bolts, returning capsule to service at 6:30 pm 5/7/15. No problems with PPE, training, mining methods or compliance issues.