Pipe being removed was covered in insulation. Corrosion of pipe was more than thought due to not being visible. Weight of upper end of pipe was heavier than expected due to kadin build up. When pipe was lifted with crane it broke in to 3' below the crane rigging which transferred the majority of weight to the upper side which was being stabilized by a rope as a safety measure.