During the weekly inspection of the 7N #1 capsule it was determined to be non-operational. The cause of the capsule being non-operational was determined to be from the guide rails in which it travels in the shaft being bent and distorted which would not allow it to travel the entire length of the shaft. There were no entrapments or injuries due to this occurrence.