The hoist operator was doing the pre-shift test trip and was getting incorrect slack rope faults on the load cells. Once on site the engineer investigated and found a loose wire in the control box of the load cells that caused it to give incorrect faults. Once they tightened the loose wire and re-calibrated it everything worked as it should.