Our facility experienced a power surge causing the power to trip in areas underground and on surface. The Tiley Brake Regulator (TBR) unit in #1 hoist tripped at this time. This caused the #1 hoist to be down for 30+ minutes until it could be reset. The unit was reset and the hoist was running again by 1:45am.