#3 hoist load cells lost calibration during test trip that started at 5:30am. Troubleshooting began at 5:56am. GL Tiley was contacted via phone while third shift was evacuating the mine with the emergency hoist. Load cells were re-calibrated at the right values and another test trip was performed with success. First shift went down at 8:05am.