An electrical power bump shut off fans supplying air to underground. The mine was evacuated. After the power was restored, the electricians were in the process of resetting all power. It was discovered that the clutch system for the #1 hoist was partially clutched-out. The electricians were able to reset the system and restore functionality to the hoist at 06:00 AM.