EE was assisting in setting a belt head. The belt head was raised using a track jack. EE was placing a half header between the timber and crib. EE raised the timber with one hand while sliding the half header between the timber and crib with the other hand. The track jack tipped over causing the belt head to sit down on blocking material pinning EE fingers on both hands.